9 am on 8th and I am worried. Did I pt the right day on our calendar, when the phone rang and Dave (our shower unit installer) was stuck on the M23 as he was coming from Haywards Heath. He is sorry but he will be late. He eventually turned up at 11.30 with his assistant (a trainee girl from Thailand) and at 6pm he was still here with half the work, but the worst part, done, and said he would have to go home and return on Tuesday.
7.45am so here I am waiting. At least all the banging and drilling is over and we can begin to see what it will look like. Anyone want the old shower??
No comments:
Post a Comment